4. Place the alignment rod in the hole on the
sensor flange. Align the flange so rod is parallel
to the process pipe.
5. Thread upper hex nuts with lock-washers until
they contact the sensor flange and tighten. Check
for proper "H" dimension and readjust if necessary.
5.95 in.
(151 mm)
"H"
pipe I.D.
process pipe
FLOW
1-1/2 in. NPT or
ISO 7/1-Rc 1-
1/2
in.
female pipe fitting
brass sensor nut
upper hex nuts
and lock-washers
lower
hex nuts
jam nuts
wall
thickness
sensor flange
cap nuts
10% of I.D.
FLOW
alignment rod
sensor flange
process pipe (top view)
The flow sensor alignment rod MUST be
parallel to the process pipe as shown.
direction of flow